Monday, January 21, 2008

Building Rebar Cages

Five of the students are enrolled in the Cultural Studies class and they went off with Pete for lecture and walk/talk down to the Maritime Arts and Inspiration Center. Aaron, Tommy, and I began construction of the rebar cages. The weather was not cooperative, blowing at 20 - 25 knots, so we did our work in the wind shade in back of the odge. We finished our work in time for lunch and then the rain set in. It continued to rain horizontally the balance of the day. Note: My compouter died this weekend so picture posts are delayed but we will catch them up soon.