Saturday, January 19, 2008

The Beat Goes On

It was back to work today. We are trying to finalize our digging and be ready to pour concrete on Monday. Our missing rebar came in on the flight today so we should be good to go. We're are having one issue that we did not expect. Some of our foundation holes fill with water at high tide, and empty out at low tide. So we will do it the Bahamian way, and go with the flow. Concrete pour starts at low tide.